Our Achievements
UTILITY SCALE
MADAGASCAR – MORONDAVA SOLAR POWER
Madagascar, MENABE – April 2022 The hybrid power plant in the commune of Bemanonga in the Morondava region, with a total renewable capacity of 4 MW. The plant has been…
MADAGASCAR – SAMBAVA SOLAR POWER
Madagascar, SAVA – March 2023 Nea has been supplying the town of Sambava with electricity since 2023 thanks to the hybrid power plant. 🔹Thermal power:4 MW 🔹Installed solar power: 0.800MWc
MADAGASCAR – ANTALAHA SOLAR POWER
Madagascar, SAVA – January 2023 Nea operates a hybrid power plant in Antalaha, providing the city with electricity. 🔹Thermal power:4 MW 🔹Installed solar power:2,075 MWc
TRADE AND INDUSTRY
THE GRAND HOTEL
Madagascar, Diego Suarez – February 2025 The Grand Hotel, a renowned establishment located in Diego-Suarez, has opted for an independent energy solution by installing a solar power plant. This initiative…
THE CASTEL GROUP
Madagascar, Ambatolampy – May 2024 The Castel Group opted for a solar solution for its factory Star Ambatolampy, thus integrating a more sustainable approach into its operations. This initiative on-grid…
CSR IMPACT & ACTION
MAZAVA NEA
Madagascar, Ambalavao – 2023 As part of the MAZAVA NEA program in collaboration with the Axian Foundation, a 2,200W solar installation was installed for the Women Entrepreneurs Cooperative in Ambalavao.…
SEKOLY TELMA
Madagascar, Antsepoka – July 2022 As part of the SEKOLY TELMA project, the Axian Foundation collaborated with NEA to set up an Off Grid solar power plant with a total…
SEKOLY TELMA
Madagascar, Andavadaoka – 2022 In partnership with NEA, the Axian Foundation solarized the Sekoly Telma located in Andavadaoka, a rural commune without electricity in the South of Madagascar, by setting…